TH350 rebuild tech

Jump to: navigation, search
m
Line 1: Line 1:
 
{{youcanedit}}
 
{{youcanedit}}
 +
 +
=Rebuilding the T-350=
  
  
Line 15: Line 17:
  
 
Once the case has been cleaned, all threads checked and or repaired, and the rear case bushing installed you can start assembly.
 
Once the case has been cleaned, all threads checked and or repaired, and the rear case bushing installed you can start assembly.
 +
 +
===Low-revers piston install===
  
 
The first item to go in the case will be the low/reverse apply piston.
 
The first item to go in the case will be the low/reverse apply piston.
Line 91: Line 95:
  
 
Then install the 3 tang thrust.
 
Then install the 3 tang thrust.
 +
 +
===Direct drum assembly===
  
 
For racing and heavy towing use, you will want to machine the direct clutch piston down approximately .160" to allow for one extra friction and steel plate for a total of 5 frictions, and 5 steels in the directs. This can be accomplished on a brake lathe. I try to keep a few machined on hand, and machine several at a time when I do so. If you need one email me and if you can supply a core, I MAY be able to sell you a piston.
 
For racing and heavy towing use, you will want to machine the direct clutch piston down approximately .160" to allow for one extra friction and steel plate for a total of 5 frictions, and 5 steels in the directs. This can be accomplished on a brake lathe. I try to keep a few machined on hand, and machine several at a time when I do so. If you need one email me and if you can supply a core, I MAY be able to sell you a piston.

Revision as of 19:09, 29 January 2011

Personal tools
Namespaces
Variants
Actions
Navigation
Categories
Toolbox