Valve train points to check
m (→Areas of the valve train that need to be checked and verified: Add link) |
(Add link) |
||
Line 30: | Line 30: | ||
*Retainer to rocker | *Retainer to rocker | ||
*Trunnion to stud boss | *Trunnion to stud boss | ||
− | *Piston-to-valve clearance (both before and after TDC on overlap) | + | *Piston-to-valve clearance (both before and after TDC on overlap). Also see [[Quench]]. |
*Push rod to guide slot in head (see image below) | *Push rod to guide slot in head (see image below) | ||
*Use '''EITHER''' self-aligning rockers '''OR''' pushrod guide slots in head '''OR''' guide plates, not two or more of these at the same time | *Use '''EITHER''' self-aligning rockers '''OR''' pushrod guide slots in head '''OR''' guide plates, not two or more of these at the same time |