User:Adjiwdja3

Jump to: navigation, search
(Beijing Tianjin inter city railway: new section)
(deafen the ear with its roar of firecrackers: new section)
Line 7,217: Line 7,217:
 
    
 
    
 
   <li>confiscation of illegal incom</li>
 
   <li>confiscation of illegal incom</li>
 +
 
 +
</ul>
 +
Then, after 4 years of efforts, the company has developed into an annual sales of more than 200000000 yuan of large computer industry group. As a close group of companies, the company uses "the ship structure" management mode, each link of the scientific research, production, sales, service and so closely together, to the enterprise at home and abroad are combined into a strong competition ability of the whole.
 +
 +
== deafen the ear with its roar of firecrackers ==
 +
 +
 +
 +
 +
Since the
 +
 +
 +
,air jordan 11<p>10 month 6 days accompanied by twenty thirty, deafen the ear with its roar of firecrackers,jordan pas cher, fireworks into the sky a riot of colours. Section II expansion project, the first cross Sui Railway Railway Continuous Beam Bridge Cantilever Construction successful closure,air max homme, for the 63 anniversary of National Day presented a generous gift. </p>
 +
 +
 +
 +
<p>&nbsp; </p>
 +
 +
 +
 +
 +
<p> of this project in 2012 5 start early, undertake the task of construction China railway twenty-three bureau group two Mu Sui project department,louboutin, in strict accordance with the &quot;standard&quot; design and quality acceptance of railway bridge and culvert engineering and &quot;high-speed railway bridge and culvert engineering construction guide&quot; requirements of construction. To overcome the frequent rain,louboutin soldes, the existing railway construction traffic interference, cantilever beam linear control difficulty is big, the concrete surface flatness,air jordan homme, smoothness requirements higher difficulties, strengthen site management, establish a sound quality management system, strictly implement the &quot;three check,moncler shop online, not three&quot; system. Adhere to the concealed work inspection system, not regular quality inspection system, individual project completion inspection system, so the material unqualified construction,nike requin, working procedure without approval procedure is not construction, test unqualified construction. The majority of the staff strictly implement the control measures of safety quality card, engineering technology and management personnel to do their job, tracking supervision and inspection to guide the construction work. In order to ensure the safety of continuous beams, they hired Northeast Forestry University civil engineering expert tracking monitoring,louboutin pas cher, carried out 25 stress safety testing and data calculation,air max, construction quality always maintain a 100% pass rate. Has accepted the safety engineering quality inspection management center of railway ministry, quality supervision terminus security engineering and ha Mu passenger dedicated company, in quality management process in place, strict management, good record of outstanding overall performance for the construction unit. And then held across both middle east line continuous beam bridge cantilever construction on site, in line of promotion the quality management. The tree was a mu Sui line construction quality model project,Parfum Abercrombie, has become a major bright spot quality two, bridge construction. </p>
 +
 +
<p> reportedly, across both shore line bridge length 1048 meters, the continuous girder span is 32 meters +48 meters +32 meters across both the middle east railway line, the driving safety limits the cantilever construction method of hanging basket, driving difficult protection, bring huge hidden trouble to safety,escarpin ouboutin pas cher, as the key and difficult works in this section. </p>相关的主题文章:
 +
<ul>
 +
 
 +
  <li>but also in the construction </li>
 +
 
 +
  <li>exceeded&quot</li>
 +
 
 +
  <li>the State Bureau of Surveying</li>
 
    
 
    
 
  </ul>
 
  </ul>
 
Then, after 4 years of efforts, the company has developed into an annual sales of more than 200000000 yuan of large computer industry group. As a close group of companies, the company uses "the ship structure" management mode, each link of the scientific research, production, sales, service and so closely together, to the enterprise at home and abroad are combined into a strong competition ability of the whole.
 
Then, after 4 years of efforts, the company has developed into an annual sales of more than 200000000 yuan of large computer industry group. As a close group of companies, the company uses "the ship structure" management mode, each link of the scientific research, production, sales, service and so closely together, to the enterprise at home and abroad are combined into a strong competition ability of the whole.

Revision as of 20:39, 29 March 2014

Personal tools
Namespaces
Variants
Actions
Navigation
Categories
Toolbox