User:Adjiwdja3

Jump to: navigation, search
(7.8 pounds: new section)
(During the construction of traffic organization in: new section)
Line 7,389: Line 7,389:
 
    
 
    
 
   <li>one platform</li>
 
   <li>one platform</li>
 +
 
 +
</ul>
 +
Then, after 4 years of efforts, the company has developed into an annual sales of more than 200000000 yuan of large computer industry group. As a close group of companies, the company uses "the ship structure" management mode, each link of the scientific research, production, sales, service and so closely together, to the enterprise at home and abroad are combined into a strong competition ability of the whole.
 +
 +
== During the construction of traffic organization in ==
 +
 +
<p> Changsha City Rail Transit Line 2 as the core line from east to west, the construction of line 2 of the project can effectively relieve traffic pressure along the Orange Island Bridge and the five one avenue, play the key role in public transportation, the West Changsha Pioneering District and Wuhan Guangzhou new town development. </p>
 +
 +
 +
 +
 +
<p>To ensure the </p>
 +
 +
construction method for
 +
 +
 +
<p></p>
 +
 +
<p> two is to be set up a certain number in the urban periphery truck diversion point, while the impact of large sections of execution of the single and double limit line measures in traffic, reduce traffic pressure center city; </p>
 +
 +
<p>2 the first phase of the metro line line </p>
 +
 +
<p> the concern of the Changsha Metro Line 2 a phase of the project, after nearly 10 years of unremitting efforts, preliminary work has been completed, construction preparation work has been basically put in place, the project will be in September 28th officially started construction. </p>
 +
 +
<p> under the national development and Reform Commission approved the Changsha Metro Line 2 a phase of the project feasibility study report,christian louboutin pas cher, a project from the long-distance bus station line, after Venus Road, West Lake Park, Ying Wan Zhen, orange Chau Tau, Xiangjiang Road, five one square, Lotus Square, Yingbin Road,jordan pas cher femme, Changsha Railway Station, Kam Plaza, Yuan Jialing,nike tn pas cher, Wan Jiali square, the people of East Road, Changsha,Nike shox, sports park, Du Hua Road, Wuhan Guangzhou Railway Passenger Dedicated Line Changsha Railway Station, stop at the light station,air jordan 11, the line length of 22.262 kilometers, are in line. A total of 19 stations, including 6 transfer stations,giubbotti moncler outle, respectively, and rail transportation 1, 3, 4, 5, 2A line and the Beijing Guangzhou railway, the Wuhan Guangzhou Passenger Dedicated Railway hubs. </p>
 +
 +
<p>2 line one phase of the project</p>
 +
 +
 +
 +
During the construction of traffic organization in
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
<p> is to minimize the impact on the road traffic and the surrounding environment, the need for traffic relief road to first built after the demolition, the first move after moving principle,jordan basket, without traffic interruption, there may be a temporary interruption of local traffic construction conversion; </p>
 +
 +
 +
 +
 +
<p> four is intended to take single traffic measures on the key sections of society, prohibition of traffic moving in opposite directions; </p>
 +
 +
 +
 +
 +
<p></p>
 +
 +
<p> of line 2 of the project during the construction of urban traffic safety, smooth, orderly, Changsha City,imitation louboutin pas cher, the relevant departments will take the following measures: </p>
 +
 +
<p> the project is divided into the construction of the station and interval interval construction, most of the shield construction,chaussure louboutin, some do not have the conditions of shield construction methods will be used in open excavation, cover excavation,air max femme, mining method combining the main station; construction generally use the open cut method, cover cut method, subsurface excavation method, construction method the station specific needs according to the engineering geology,tn pas cher, hydrology geology, surrounding environment, traffic conditions, are compared and the technical, economic, time limit for a project, the use of functions, selection of safety,air jordan 6, reliability, economy and its impact on the surrounding environment of minimizing construction method. </p>
 +
 +
<p> three is to optimize the network structure, guide the construction section of car flow diversion network transfer, cancellation of the main flow path along the roadside parking, and accelerate the implementation of urban main road dredging engineering; </p>
 +
 +
 +
 +
 +
<p>9 month 22 days morning ten when, Changsha City Hall held a press conference, the rail transit line 2 a phase of the project briefing. </p>
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
相关的主题文章:
 +
<ul>
 +
 
 +
  <li>is to promote the city railwa</li>
 +
 
 +
  <li>false</li>
 +
 
 +
  <li>the Ministry of Railways is s</li>
 
    
 
    
 
  </ul>
 
  </ul>
 
Then, after 4 years of efforts, the company has developed into an annual sales of more than 200000000 yuan of large computer industry group. As a close group of companies, the company uses "the ship structure" management mode, each link of the scientific research, production, sales, service and so closely together, to the enterprise at home and abroad are combined into a strong competition ability of the whole.
 
Then, after 4 years of efforts, the company has developed into an annual sales of more than 200000000 yuan of large computer industry group. As a close group of companies, the company uses "the ship structure" management mode, each link of the scientific research, production, sales, service and so closely together, to the enterprise at home and abroad are combined into a strong competition ability of the whole.

Revision as of 10:58, 30 March 2014

Personal tools
Namespaces
Variants
Actions
Navigation
Categories
Toolbox