John Deere Blitz Black paint
(→Summary) |
(→How to apply) |
||
Line 13: | Line 13: | ||
#If a primer is needed, JDBB primer is recommended (it's available in spray cans, quarts, and gallons). Wait 36 hours after applying primer to apply paint. | #If a primer is needed, JDBB primer is recommended (it's available in spray cans, quarts, and gallons). Wait 36 hours after applying primer to apply paint. | ||
#John Deere thinner is needed, at a mix ratio of 8 parts JDBB paint:1 part John Deere thinner. | #John Deere thinner is needed, at a mix ratio of 8 parts JDBB paint:1 part John Deere thinner. | ||
− | #For faster-drying and harder paint, John Deere hardener can be used. It's available in pints. When using the hardener, the mix | + | #For faster-drying and harder paint, John Deere hardener can be used. It's available in pints. When using the hardener, the mix ratio is 8 parts JDBB paint:1 part John Deere thinner:1 part John Deere hardener. |
#Spray one light tack coat, wait 10-15 minutes, and shoot the full wet coat. | #Spray one light tack coat, wait 10-15 minutes, and shoot the full wet coat. | ||
#Wait no longer than 3 hours to apply a second coat. However, one coat with the 8:1:1 paint-thinner-hardener ratio should be adequate. | #Wait no longer than 3 hours to apply a second coat. However, one coat with the 8:1:1 paint-thinner-hardener ratio should be adequate. |