John Deere Blitz Black paint

Jump to: navigation, search
(Summary)
(How to apply)
Line 13: Line 13:
 
#If a primer is needed, JDBB primer is recommended (it's available in spray cans, quarts, and gallons). Wait 36 hours after applying primer to apply paint.
 
#If a primer is needed, JDBB primer is recommended (it's available in spray cans, quarts, and gallons). Wait 36 hours after applying primer to apply paint.
 
#John Deere thinner is needed, at a mix ratio of 8 parts JDBB paint:1 part John Deere thinner.
 
#John Deere thinner is needed, at a mix ratio of 8 parts JDBB paint:1 part John Deere thinner.
#For faster-drying and harder paint, John Deere hardener can be used. It's available in pints. When using the hardener, the mix ration is 8 parts JDBB paint:1 part John Deere thinner:1 part John Deere hardener.
+
#For faster-drying and harder paint, John Deere hardener can be used. It's available in pints. When using the hardener, the mix ratio is 8 parts JDBB paint:1 part John Deere thinner:1 part John Deere hardener.
 
#Spray one light tack coat, wait 10-15 minutes, and shoot the full wet coat.
 
#Spray one light tack coat, wait 10-15 minutes, and shoot the full wet coat.
 
#Wait no longer than 3 hours to apply a second coat. However, one coat with the 8:1:1 paint-thinner-hardener ratio should be adequate.
 
#Wait no longer than 3 hours to apply a second coat. However, one coat with the 8:1:1 paint-thinner-hardener ratio should be adequate.

Revision as of 20:40, 12 July 2006

Personal tools
Namespaces
Variants
Actions
Navigation
Categories
Toolbox